+1 demo: Basic page

فارسی

Telegram

Moving to New Workshop

2/21/2015

This Workshop (ASK) developed in  last year   , factory located in Shahid Salimi Industrial City (Tabriz) with 13500 m2 workshop and 3000 m2 foundry. Therefore, the cost of production and assembly and transportation is lower than ago. Also the project monitoring will be better and lead time is reduced than before. In total, the integration of unites will be a better output in result and Customer satisfaction.